首页 > 职业技能鉴定> 中国质量协会考试
题目内容 (请给出正确答案)
[主观题]

During PTN upgrade, to copy version file zxr10.zar in the master main board to the sl

ave main board, you can execute command()。

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“During PTN upgrade, to copy ve…”相关的问题
第1题
On ZTE's PTN products, command()is used to check whether boot version supports on
On ZTE's PTN products, command()is used to check whether boot version supports on

line upgrade or not.

点击查看答案
第2题
During the L3 monitoring process of ZTE PTN equipment, regardless of the MCCVLAN monit
点击查看答案
第3题
During creation of a tunnel in PTN device, one ID is only used to identify one tunnel
点击查看答案
第4题
About selecting PTN device during engineering design, which of the following are corre

A.6100 serves as devices at convergence layer.

B.9000 is used at core layer.

C.6200 is used at access layer and convergence layer.

D.6300 is used at convergence layer.

点击查看答案
第5题
During the OAM monitoring of PTN, a CV/CC frame. is receiveD.Its MEL is the same as th
e one of destination MEP, but its MEG ID is different. In this case, which alarm will be submitted?()

A.Loss of continuity

B.Error MEL

C.Error merge

D.Error MEP

点击查看答案
第6题
Which of the following should be done before device power-on during PTN commissioning

A.check whether system version is correct

B.check whether subrack is firmly mounted

C.check whether boards are correctly plugged

D.check whether cables are laid as required

E. Check whether physical link is set up

点击查看答案
第7题
About PTN device's alarm report function in EMS, which of the following are correc
t?()

A.To display current alarm of device correctly, the device needs to report current alarm to EMS actively. Therefore, necessary configuration for the device to actively report alarms must be correctly set.

B. Protection switching event alarm occurs at the instant when protection group switching happens, so it is not durative alarm. Therefore, after the alarm occurs, it is immediately saved in locking alarm. You can check it only in the locking alarms.

C. If EMS server timezone is different from PTN device timezone, alarm occurrence time on PTN device will be different from that on EMS. Therefore, during commissioning of PTN, you should set PTN timezone to be consistent with EMS timezone, usually local timezone.

D. None of the above

点击查看答案
第8题
Attn: All StaffThe purpose of this memo is to warn you about a disruption to the company's

Attn: All Staff

The purpose of this memo is to warn you about a disruption to the company's Internet service. From 12 pm to 6 pm on Wednesday the IT team (81) a new server for the entire network.

The new server should allow us to store larger amounts of data more reliably, so it is a valuable change. (82) , this means that you will not be able to access the Intemet from your work computer on Wednesday afternoon.

For some employees, such as sales staff and customer relations managers, Internet access and email are essential. Those employees will be given permission to work from home on that afternoon.

For all other staff, please be sure to prepare offline tasks to carry out during this time. We thank you for your understanding and hope that the upgrade does not cause too much (83) for employees.

Regards,

Naomi Lyneham, General Manager

(41)

A.will be installing

B.would install

C.will be installed

D.has been installed

点击查看答案
第9题
本周学到的“改善”的英文怎么说()

A.boost

B.improve

C.upgrade

点击查看答案
第10题
Steps for local upgrade of ZXCTN6100: enter boot mode and type (), and equipment vers
Steps for local upgrade of ZXCTN6100: enter boot mode and type (), and equipment vers

Steps for local upgrade of ZXCTN6100: enter boot mode and type (), and equipment version will be PUT to memory RAM of 6100.

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改